The Mountain Road will be closed for a week during the Easter school holidays to enable work to take place ahead of the TT Races.


Work will include lining, ditching and sign maintenance, plus the resurfacing and re-profiling of the carriageway on the Keppel Gate section of the course.
The road will close between Creg-ny-Baa and Ramsey Hairpin at 8am on Easter Monday, April 6, and reopen at 6pm on Sunday, April 12, sooner if the works allow.
Infrastructure Minister Phil Gawne MHK said: ‘I would like to thank people in advance for their patience and co-operation while this scheme takes place.’

http://www.iomtoday.co.im/news/isle-of-man-news/mountain-road-to-close-for-a-week-to-allow-tt-2015-preparation-works-1-7170414


RE: Just in case you were thinking of popping over for Easter! - warrior - 25-03-2015

(24-03-2015, 05:54 PM)panman Wrote: The Mountain Road will be closed for a week during the Easter school holidays to enable work to take place ahead of the TT Races.


Work will include lining, ditching and sign maintenance, plus the resurfacing and re-profiling of the carriageway on the Keppel Gate section of the course.
The road will close between Creg-ny-Baa and Ramsey Hairpin at 8am on Easter Monday, April 6, and reopen at 6pm on Sunday, April 12, sooner if the works allow.
Infrastructure Minister Phil Gawne MHK said: ‘I would like to thank people in advance for their patience and co-operation while this scheme takes place.’

http://www.iomtoday.co.im/news/isle-of-man-news/mountain-road-to-close-for-a-week-to-allow-tt-2015-preparation-works-1-7170414

I'll be interested to see the extent of the "re profiling" at Keppel Gate, I doubt it'll be a big change given the time available and the rest of the work required, but a metre off the inside verge there could be worth a fraction off the lap time.


RE: Just in case you were thinking of popping over for Easter! - Nev14 - 25-03-2015

Was there not a couple of incidents there because of the high banking perhaps they are re-profiling the bank rather than the road.